Below I have created a film schedule that Csenge and I will use when filming our opening sequence. Whilst we may not fully stick to the schedule, it will act as a basic guideline for how long we should spend on each shot each time we film.
Time
|
Activity
|
Crew Needed
|
Equipment Needed
|
10:00
|
Checking all necessary crew is present, leaving to travel to the filming location.
|
Actors relevant to the scene as well as Csenge and I
|
All equipment needed for the project.
|
10:30
|
Setting up tripod, finalising how the camera should be angled.
|
All actors and crew.
|
Camera tripod, chairs for Tony A and Tony B
|
11:00
|
Take test shots to ensure the camera is working and has been prepared correctly.
|
Mostly Csenge and I
|
Camera, Sound Mic, costume and tripod
|
11:10
|
Film the shots of my character approaching the meeting.
|
Csenge and I
|
Camera, Sound Mic, costume and tripod
|
12:00
|
LUNCH BREAK
|
LUNCH BREAK
|
LUNCH BREAK
|
12:50
|
Film the ‘meeting’ shots - multiple times so we can later decide which shots work best for the scene.
|
All actors as well as Csenge to be in charge of filming.
|
The prop ‘burner phone’ as well as the camera and it’s tripod. Aldo costumes for each ‘new’ character.
|
13:30
|
Check all footage is of a good quality, reshoot scenes if necessary
|
Mostly Csenge and I however the other actors may be needed if scenes are not to a high quality.
|
Camera
Sound Mic
|
13:50
|
Pack away all equipment
|
Csenge and I
|
N/A
|
No comments:
Post a Comment
Note: only a member of this blog may post a comment.