Thursday, 24 November 2016

Filming Schedule

Filming Schedule
Below I have created a film schedule that Csenge and I will use when filming our opening sequence. Whilst we may not fully stick to the schedule, it will act as a basic guideline for how long we should spend on each shot each time we film.

Time
Activity
Crew Needed
Equipment Needed
10:00
Checking all necessary crew is present, leaving to travel to the filming location.
Actors relevant to the scene as well as Csenge and I
All equipment needed for the project.
10:30
Setting up tripod, finalising how the camera should be angled.
All actors and crew.
Camera tripod, chairs for Tony A and Tony B
11:00
Take test shots to ensure the camera is working and has been prepared correctly.
Mostly Csenge and I
Camera, Sound Mic, costume and tripod
11:10
Film the shots of my character approaching the meeting.
Csenge and I
Camera, Sound Mic, costume and tripod
12:00
LUNCH BREAK
LUNCH BREAK
LUNCH BREAK
12:50
Film the ‘meeting’ shots - multiple times so we can later decide which shots work best for the scene.
All actors as well as Csenge to be in charge of filming.
The prop ‘burner phone’ as well as the camera and it’s tripod. Aldo costumes for each ‘new’ character.
13:30
Check all footage is of a good quality, reshoot scenes if necessary
Mostly Csenge and I however the other actors may be needed if scenes are not to a high quality.
Camera
Sound Mic
13:50
Pack away all equipment
Csenge and I
N/A

No comments:

Post a Comment

Note: only a member of this blog may post a comment.